world’s longest rail tunnel sees light at end of decades’ wait
Last Updated : GMT 09:40:38
Themuslimchronicle, themuslimchronicle
Themuslimchronicle, themuslimchronicle
Last Updated : GMT 09:40:38
Themuslimchronicle, themuslimchronicle

World’s longest rail tunnel sees light at end of decades’ wait

Themuslimchronicle, themuslimchronicle

Themuslimchronicle, themuslimchronicleWorld’s longest rail tunnel sees light at end of decades’ wait

Miners celebrate after a giant drilling machine completes the tunnel beneath theSwiss Alps
Geneva - Arab today

When Swiss engineer Carl Eduard Gruner came up with the idea to build the world’s longest rail tunnel under the Alps in 1947, he predicted the visionary project could be finished by the start of the 21st century.

He would turn out to be off by 16 years.

Gruner’s sketch and technical paper, called Journey through the Gotthard Base Tunnel (GBT) in the year 2000, planted the seeds for a venture that will be launched this week and aims to transform travel through the heart of Europe.

Constructing the 57-kilometre rail tunnel took just over 12 billion Swiss francs (Dh44 billion) and some 2,400 workers, according to Swiss government statistics.

More than 28 million tonnes of rock had to be excavated from the mountain near the Gotthard pass

The bumpy road from Gruner’s initial idea to the official start of construction in 1999 included bureaucratic delays and concern over the project’s financial viability.

Switzerland’s federal government set up a committee in 1963 to look into the building of an alpine base tunnel, but opinions were split over various proposals, before an official body eventually ruled in 1983 that the project was “not urgent.”

Momentum in favour of the GBT built again ahead of a 1992 referendum, which supported the project, but public outcry about the expense put work on hold.

Eventually, a November 1998 referendum closed the deal, when 64 per cent of Swiss voters approved the final plans along with funding schemes, including a new road tax.

“It’s a big engineering achievement,” Martin Knights of the London-headquartered Institution of Civil Engineers, said.

The tunnel runs from Erstfeld in the central Swiss canton of Uri, to Bodio in southern Ticino canton, and will shave the train journey from Zurich to Milan in northern Italy down to two hours and 40 minutes, roughly an hour less than it currently takes.

The new route also aims to make rail freight more efficient including by supporting heavier cargo, which should reduce the number of diesel-guzzling lorries on the roads, in turn, improving traffic and curbing pollution.

The number of daily rail passengers is also expected to increase from the current rate of 9,000 people to 15,000 by 2020, according to the Swiss federal railway service.

In a study of the GBT’s possible economic benefits, Swiss bank Credit Suisse forecast a range of positive impacts driven by an easier movement of goods, growth in day-trip tourism and higher property values in the affected cantons linked to increased accessibility.

German Chancellor Angela Merkel, French President Francois Hollande and Italian Prime Minister Matteo Renzi, along with Swiss officials, are due to attend Wednesday’s grand opening, which will feature a ceremonial run.

Full service starts in December.

Had Gruner attempted to break ground on the tunnel when he conceived the idea 69 years ago, engineers would have had to undertake a costly and dangerous effort to blast and drill through a massive amount of mountain rock.

But the project benefited in the end from major technical advances in tunnel-boring machines that began to pick up in the 1960s and 70s, Knights said.

The boring machinery used for the Gotthard Tunnel is “a whole moving factory, half a kilometre in length”, which synchronises all the steps needed to carve a passage through a mountain, he said.

While cutting through the rock, the machine throws the debris backwards and simultaneously places the pre-formed segments of concrete that form the shape of the tunnel.

A separate system grouts the pieces together.

Editor of Ground Engineering magazine, Claire Smith, said the success of the ambitious Gotthard venture, which was completed on schedule, “has cleared the path for many other [similar] projects”.

The GBT has been viewed as a trailblazer for a high-speed rail link between the French city of Lyon and Turin in northern Italy, which has faced delays and opposition from environmental groups.

It also paves the way for Austria’s Brenner Tunnel, set to open in about a decade.

When it officially opens on Wednesday, the GBT will overtake Japan’s 53.9-kilometre Seikan tunnel as the world’s longest train tunnel and bump the 50.5-kilometre Channel Tunnel that links England and France into third place.

The Brenner Tunnel could however slot into second place when it opens, with an estimated length of 55 kilometres

source : gulfnews

 

themuslimchronicle
themuslimchronicle

Name *

E-mail *

Comment Title*

Comment *

: Characters Left

Mandatory *

Terms of use

Publishing Terms: Not to offend the author, or to persons or sanctities or attacking religions or divine self. And stay away from sectarian and racial incitement and insults.

I agree with the Terms of Use

Security Code*

world’s longest rail tunnel sees light at end of decades’ wait world’s longest rail tunnel sees light at end of decades’ wait

 



Themuslimchronicle, themuslimchronicle

GMT 07:10 2017 Tuesday ,28 November

Sudan and Russian sign nuclear agreement

GMT 06:22 2018 Friday ,19 January

To develop oil fields retaken from Kurds

GMT 09:14 2017 Thursday ,05 October

Sahar Al Sayegh happy for honoring in festival

GMT 16:09 2017 Thursday ,31 August

Pakistan dismisses U.S. military commander

GMT 10:35 2012 Tuesday ,31 July

Silkor reinforces presence in Lebanon

GMT 12:23 2017 Thursday ,20 April

Premier congratulated by Foreign Minister

GMT 10:07 2017 Tuesday ,29 August

Hamilton fears Ferrari consistency

GMT 06:33 2016 Sunday ,27 November

New York Fashion Week

GMT 09:11 2017 Thursday ,10 August

Qatar offers visa-free entry to 80 nationalities

GMT 09:04 2017 Friday ,17 November

Assembly Speaker Meets Indonesian Ambassador

GMT 10:46 2017 Sunday ,17 December

Artificial intelligence finds solar system

GMT 05:57 2017 Monday ,04 December

Iran inaugurates new Indian Ocean port

GMT 17:46 2011 Friday ,05 August

Opponents: Zambian president can\'t run

GMT 16:01 2012 Thursday ,04 October

Yemen\'s Shaema, Aziz reign supreme

GMT 08:19 2017 Thursday ,02 February

Actor Duraid Lahham: All offer are “superficial”

GMT 11:13 2012 Thursday ,22 March

Samsung Series 9 laptop review

GMT 12:03 2011 Monday ,19 December

Golfer Pagunsan named players\' player of the year

GMT 06:21 2012 Wednesday ,02 May

The \'Manhunt\' to capture Osama Bin Laden

GMT 09:16 2012 Saturday ,02 June

Dispensing with Bashar's services

GMT 23:22 2011 Thursday ,12 May

One Royal Edinburgh
Themuslimchronicle, themuslimchronicle
Themuslimchronicle, themuslimchronicle
 
 Themuslimchronicle Facebook,themuslimchronicle facebook  Themuslimchronicle Twitter,themuslimchronicle twitter Themuslimchronicle Rss,themuslimchronicle rss  Themuslimchronicle Youtube,themuslimchronicle youtube  Themuslimchronicle Youtube,themuslimchronicle youtube

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2025 ©

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2025 ©

muslimchronicle muslimchronicle muslimchronicle muslimchronicle
themuslimchronicle themuslimchronicle themuslimchronicle
themuslimchronicle
بناية النخيل - رأس النبع _ خلف السفارة الفرنسية _بيروت - لبنان
themuslimchronicle, themuslimchronicle, themuslimchronicle